Pre-fabricated steel house (also called pre-fabricated house). It is pre-built with support frame and steel materials. It is installed according to pre-set engineering architecture drawings. The whole steel structure is pre-made. Then it is transported to the site and installed in a short time.
In 1960s. Engineering designs are standardized for buildings. Initially, it is sold in the market as pre-fabricated steel houses. Structure of a building is pre-designed.
A complete pre-fabricated steel house. It will go under three stages: Design, fabrication of components and installation at site.
It is a kind of product having 5 component PIR foam structure. According to German technology automatic continuous line. Manufactured at Phuong Nam Soundproof Insulating Factory. With paint coating of below surface Stick⁺ Foam have special paint formula. It is separately design for Sandwich
Panel application. it enhances optimal bonding on insulating surface. shielded with galvanized steel coated by Activate technology for super durable 4-layers matrix structure. Barrier is created to protect steel. It increases anti corrosion for surface. Useful time is increased even in harsh environment. Light density is from 40 to 48kg/m3, etc. it creates considerable difference in quality, aesthetics from other normal panels.
Section of building panel is a very important stage. Panel products must have tight clamp, consistent foam density. It mustn’t be accumulated with air bubbles. Specifications for erection of old pre-fabricated steel houses must ensure compliance with technical requirements. And they must be installed according to their previous design
Panels to be installed on steel frame. It is needed to locate position before erection. In case of horizontal erection, the length of panel is often high. Hoisting machine must be used to pull panel to its installation position. After erection, aluminum U concealing screws is used. For vertical erection, with wall of more than 7 m high, panel joining H is used
And after installation of panels for steel house. Screw concealing aluminum U and water proof steel edge details are used for the joints between walls. Edge positions and panel joints are filled silicon.
Factory is completed on steel frame. Combined with insulating panel. This helps enterprise optimize its construction cost Operation technical criteria are ensured. Environment protection, safe to laborers and user.
Pre-fabricated steel house is possible to cross long span. It reduces load of projects, easy to erect, remove and reusable. Especially, insulating products of Phuong Nam Panel has tight clamping composition to allow short construction schedule. The appearance of whole projects is increased. Also, pre-fabricated steel house and Phuong Nam Panel. Are possible to combined with multi materials. This “combination” is widely applied in many small, big projects such as: Dai Dung, Atad, BMB, etc
Phuong Nam Panel always accompany the sustainable development of every enterprise!